In the SV Chairs meeting on Thursday we discussed the number of LRM Drafts and the review required. We decided to make the following
change to the number of drafts and the schedule (end date is still the same).
Close review of Draft 4 13 February 2004
Chairs to review all changes for missing items on the 13th.
Distribute Draft 5 on 20 February 2004
Email vote on Draft 5 closing on 27 February 2004
Send Draft 5 to board on 1 March 2004
This removes Draft 6. It was felt that little would be gained by forcing through one extra draft with little time for review. This
will allow for a little longer review of Draft 4 (a couple days) and a more reasonable schedule to create, distribute, and view
Draft 5. This means that Draft 5 is the final Draft.
Regards
David
David W. Smith
Synopsys Scientist
Synopsys, Inc.
Synopsys Technology Park
2025 NW Cornelius Pass Road
Hillsboro, OR 97124
Voice: 503.547.6467
Main: 503.547.6000
FAX: 503.547.6906
Email: david.smith@synopsys.com
http://www.synopsys.com <http://www.synopsys.com/>
This archive was generated by hypermail 2b28 : Sun Feb 08 2004 - 18:53:18 PST