In the SV Chairs meeting on Thursday we discussed the number of LRM Drafts and the review required. We decided to make the following
change to the number of drafts and the schedule (end date is still the same).

 

Close review of Draft 4 13 February 2004

            Chairs to review all changes for missing items on the 13th.

Distribute Draft 5 on 20 February 2004

Email vote on Draft 5 closing on 27 February 2004

Send Draft 5 to board on 1 March 2004

 

This removes Draft 6. It was felt that little would be gained by forcing through one extra draft with little time for review. This
will allow for a little longer review of Draft 4 (a couple days) and a more reasonable schedule to create, distribute, and view
Draft 5. This means that Draft 5 is the final Draft.

 

Regards

David

 

 

David W. Smith

Synopsys Scientist

 

Synopsys, Inc.

Synopsys Technology Park

2025 NW Cornelius Pass Road

Hillsboro, OR 97124

 

Voice: 503.547.6467

Main: 503.547.6000

FAX: 503.547.6906

Email: david.smith@synopsys.com

http://www.synopsys.com <http://www.synopsys.com/>

 



This archive was generated by hypermail 2b28 : Sun Feb 08 2004 - 18:53:18 PST