The sv-ec has 21 mantis items in the "completed" state. These need to be closed. The latest draft should be checked to ensure that the Editor has implemented the changes properly. If the changes were made correctly, the status should be set to "closed". In the process of closing them mantis will display a pop-up where a note can be entered. A short note should be added which says something like the following: The changes were verified to have been implemented correctly in draft 9. If the changes were not implemented properly, change the status to "Editor" and add a note explaining what was not implemented properly. We have until Monday, July 27, 8am PDT to get this done. Neil -- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean.Received on Thu Jul 23 11:54:18 2009
This archive was generated by hypermail 2.1.8 : Thu Jul 23 2009 - 11:55:22 PDT