[sv-ec] Meeting Monday December 17 2007, 11-1:00pm, continuation of Monday December 10 2007. Conference call bridge is provided below. Toll Free Dial In Number: (888)635-9997 *************************************** PARTICIPANT CODE: 0536987# *************************************** International Access/Caller Paid Dial In Number: (763)315-6815 1. p1800 working group meeting update (12/13/2007) --------------------------------------------------- Deadline for sv-ec and sv-ec was extended to end of day 12/17/2007. feature-freeze schedule. 11/12/07 Committees must open active Mantis items that they are going to complete for this release. They may not work on any item not on in this list. 12/17/07 SV-BC and SV-EC must complete all items from their Mantis list. Past this date they are only authorized to work on merge, editing and champions issues. 02/15/08 SV-CC must complete all items from its Mantis list. Past this date they are only authorized to work on merge, editing and champions issues. 02/28/08 SV-AC freezes. It does not get leeway for merge, editing and champions issues. 2. Review/discuss result of email ballot ---------------------------------------- The summary results: Passed: section a) CLOSE 412, 517, 518, 519, 521, 801 section b) 958, 2227 Did not pass: section a) 516, 520, 522, 974 section b) 1447, 1858 [both proposals], 2055, 2137, 2181 Discussion on : 1447, 516, 520, 522, 974 2137, 2181 1858 2055 3. Other mantis items -------------------------------------------- 3.1) Need to provide sv-ec analysis by end of January 28 2008. Discussion on 1556: 1556 SV-EC in-line static variable initialization - require keyword static? 3.2) 2183 3.3) Prioritized list for feature freeze review and plans: b. The list is appended. 2109, 2080 name resolution and related items. [assigned: Gord] [2107, 2106, 2108, 1268, 1809, 1043, 1832, 1508, 1516, 1858, 1583] 1809: Francoise is to write a proposal 1858: discussion to continue 1702 801 list, covers all queue items [assigned: Jonathan, Francoise, Steven] 412 5.14.1 Queue operator examples use aggregate constructors incorrectly 522 use of concatenation in 5.14.2 (Francoise) 521 pattern assignment for queues (Francoise) 520 example of queues assignment (Francoise) 519 section 5.14,empty array literal syntax (Francoise) 518 queues and arrays (Francoise) 517 concatenation syntax usage section 5.14 (Francoise) 516 5.7 and 5.8 description of type compatible arrays 974 2164 Use "base class" instead of "parent class" in 8.12 [assigned: Arturo] 1714 singular type as the mailbox default 1256 linked list description 1719 Shallow copy constructor needs clarification 1857 external method definitions and parameterized class types 1858 Name binding in inline constraints 2055 coverage bin distribution is not even 2149 Covergroups sample method with arguments 5. Review mantis items with proposals ---------------------------------------------------- 2113 Inconsistency in constraining assoc array size 2137 2181 Ambiguity in implicit declaration of production variables in randsequence 2183 6. Next meetings in 2008 -------------------------------- Monday January 7 2008 Monday January 21 2008 http://standards.ieee.org/board/pat/pat-slideset.ppt http://www.eda-stds.org/sv-ec/Minutes/SV-EC_p1800_2008_Draft3_list.txt Note: the meeting time/date is updated on the web: http://www.eda-stds.org/sv-ec/Minutes.html http://www.eda.org/sv-ec/Minutes/SV-EC_Meeting_November_12_2007_Minutes. txt -- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean. -- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean.Received on Sun Dec 16 00:42:12 2007
This archive was generated by hypermail 2.1.8 : Sun Dec 16 2007 - 00:43:18 PST