This review is based on the pre-890 version of the chapter. Everything is consistent with the original documents except where I have noted below and potentially cross-section references. pg. 25-26 4.5 Determinism 4.6 Nondeterminism Both of these sections talk about adding events "on" the event regions. Section 4.3 uses the term adding events "in" the event regions. I believe it reads better and is easier for a user to understand using "in". In either case, all of these sections need to be consistent with each other (i.e. either use "on" or "in"). pg. 27 4.8.4 Nonblocking assignment Last sentence again uses "on" the event region (same issue as the above). The delay in this section is implied to be an intra-assignment delay as is explicitly stated in "4.8.3 Blocking assignment". Does this need to be explicitly stated here also to make it clear? If not, someone might incorrectly assume that a left-hand side delay will also give this behavior when in fact the evaluation and update will be done in the same time step after the left-hand side delay has been completed. pg. 27 4.8.5 Clocking block assignment I think it would be good to have at least an overview of this assignment here with a cross-section reference pointing to more details (i.e. similar to the other assignments). Thanks, -- Heath #################################### | | | HMC Design Verification, Inc. | | | | Heath Chambers | | President/Verification Designer | | 1203 San Juan Drive | | Roswell, NM 88201 | | | | hmcdvi@msn.com | | Phone: (505)627-2069 | | Fax: (505)627-2069 | | <http://hmcdv.iwarp.com/> http://hmcdv.iwarp.com | | | #################################### -- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean.Received on Wed Apr 11 09:44:14 2007
This archive was generated by hypermail 2.1.8 : Wed Apr 11 2007 - 09:44:46 PDT