The main item that needs to be completed ASAP is for the assignee
of each Acknowledged erratum to check whether Draft 3 accurately
implements the details of the approved proposal. No SV-EC votes
are required for this step of the process.
4 Ray
6 Arturo
7 Arturo
8 Ray
9 Dave
25 Neil
172 Ray
173 Arturo
175 Mehdi
231 Surrendra
250 Mehdi
252 Arturo
260 Francoise
If you are satisfied with the editorial implementation of your
assigned erratum, update the erratum to Closed and Fixed.
If you find an editorial problem, assign it back to SV-LRM and
send some e-mail about it to Stu, Mehdi, Neil and Karen --
http://www.eda.org/sv-bc/hm/2639.html
-- Brad
p.s. After going through some of my assigned errata for SV-BC, I can
report that Stu has done an excellent job. The only problem I've
found so far was caused by my own neglect to add blue to highlight
an addition.
-----Original Message-----
From: owner-sv-ec@eda.org [mailto:owner-sv-ec@eda.org]On Behalf Of
Francoise Martinolle
Sent: Wednesday, January 19, 2005 9:24 AM
To: 'Mehdi Mohtashemi'; sv-ec@eda.org
Subject: [sv-ec] 1800 draft 3 review
Mehdi,
I may have missed some email from you regarding this. But I am
wondering if there is a plan for review of draft 3 of the LRM and in
particular
to verify that the changes have been well incorporated in draft 3.
I am sorry if I missed an email from you on this subject.
Francoise
'
Received on Wed Jan 19 13:17:59 2005
This archive was generated by hypermail 2.1.8 : Wed Jan 19 2005 - 13:18:21 PST